Project Scheduler
Chesapeake, VA  / Fairfax, VA  / Richmond, VA  / Williamsburg, VA  / Columbia, MD  / Raleigh, NC ...View All
View Less
Share
Posted 20 days ago
Job Description
Project Scheduler
Job Locations US-VA-Chesapeake | US-VA-Fairfax | US-VA-Richmond | US-VA-Williamsburg | US-MD-Columbia | US-NC-Raleigh
ID 2024-2043 Category Project Controls/Risk Management Type Full-Time Regular
Overview

MBP is looking for a Scheduler in the US east coast area with experience providing schedule development and/or review services on transportation, rail, construction projects.Proficient in Oracle P6 and experienced with one or more of the following: Microsoft Project, Phoenix Project Manager, or similar is preferred.

Responsibilities

Main Duties:

    Performs reviews of contractor-submitted baseline and periodic schedule updates for compliance with the specification and overall reasonableness.
  • Provides schedule development and updates services for contractors.
  • Develops and/or reviews time extension requests.
  • Assists with the development and/or analysis of post-construction delay analyses
  • Analyze drawings, specifications and statement of work in preparation for schedule review services .
  • Evaluate the actual construction status relative to the proposed plan.
  • Analyze and communicate the impact of changes to the schedule.
  • Occasional overnight travel may be required.
Qualifications

Skills and Abilities

  • Ability to relate technical knowledge to a non-technical audience.
  • Detail oriented and can manage multiple priorities with minimal guidance.
  • Skilled at developing and maintaining relationships.
  • High degree of initiative, personal responsibility, and integrity.
  • Proficiency in Primavera (P6) software.
  • Proficiency with Microsoft Office software programs including Word, Excel, and PowerPoint

Education

  • Undergraduate degree in Engineering, Architecture, Construction Management, or a related discipline.
  • 3+ years of scheduling experience on construction projects.

* Specific title based on candidate's education, background, and level of experience.

MBP is an EOE AA M/F/Vet/Disability Employer.

 

Job Summary
Company
MBP
Start Date
As soon as possible
Employment Term and Type
Regular, Full Time
Required Education
Bachelor's Degree
Required Experience
3+ years
Email this Job to Yourself or a Friend
Indicates required fields